{"iri":"https://w3id.org/bimei/term/integrated-project-delivery","type":"term","register":"canonical","status":"canonical","grounding":"pending","liveVersion":1,"pinned":false,"version":null,"provenance":{"sourceApp":"legacy-bimd","sourceId":"integrated-project-delivery","changeSource":"override","curator":"legacy-migration"},"language":"en","jurisdiction":null,"label":{"lang":"en","jurisdiction":null,"requestedJurisdiction":null,"fellBack":false,"prefLabel":"Integrated Project Delivery","definition":"Integrated Project Delivery (IPD) is a contractual relationship with a 'more equitable' approach to distributing risks and benefits amongst main [[Project Participant]]s. IPD is based on several key principles including: shared risk/reward, early involvement of key participants, and open communications. IPD encourages the use of 'appropriate technology' but does not necessarily require the use of [[BIModel]]s. Please note that the term IPD has changed in meaning over time and some [[Noteworthy BIM Publication]]s still refer to the old definition","altLabels":["IPD","Integrated Design and Construction"]},"labels":{"ar":{"*":{"prefLabel":"تسليم المشروع المتكامل","definition":"تسليم المشروع المتكامل (IPD)هو علاقة تعاقدية مع نهج \" أكثر انصافاً\" لتوزيع المخاطر والمنافع فيما بين [[المشاركين في المشروع]]. ويقوم IPD  على العديد من المبادئ الرئيسية بما في ذلك:  تقاسم المخاطر \\المكافأة، والمشاركة المبكرة من المشاركين الرئيسيين، والاتصالات المفتوحة. يشجع IPD استخدام \"التكنولوجيا المناسبة\" لكن لايتطلب بالضرورة استخدام [[نماذج معلومات البناء]]. يرجى ملاحظة أن مصطلح IPD قد تغير في المعنى بمرور الوقت وبعض [[منشورات نمذجة معلومات البناء الجديرة بالملاحظة]] لا تزال تشير إلى التعريف القديم.","altLabels":[]}},"en":{"*":{"prefLabel":"Integrated Project Delivery","definition":"Integrated Project Delivery (IPD) is a contractual relationship with a 'more equitable' approach to distributing risks and benefits amongst main [[Project Participant]]s. IPD is based on several key principles including: shared risk/reward, early involvement of key participants, and open communications. IPD encourages the use of 'appropriate technology' but does not necessarily require the use of [[BIModel]]s. Please note that the term IPD has changed in meaning over time and some [[Noteworthy BIM Publication]]s still refer to the old definition","altLabels":["IPD","Integrated Design and Construction"]}},"cs":{"*":{"prefLabel":"Integrovaná dodávka projektu","definition":"Integrovaná dodávka projektu (IPD) je smluvní vztah se 'spravedlivějším' přístupem k rozdělení rizik a přínosů mezi hlavní [[Účastníky projektu]]. IPD je založena na několika klíčových principech zahrnujících: sdílené riziko/odměnu, časné zapojení klíčových účastníků a otevřenou komunikaci. IPD podporuje používání 'vhodných technologií', ale nevyžaduje nutně využití [[BIModelů]]. Pozor, význam termínu IPD se v průběhu času změnil a některé [[Významné publikace o BIM]] se stále odkazují na starou definici","altLabels":["Integrované dodávky projektu","Integrovaných dodávek projektu"]}}}}