{"iri":"https://w3id.org/bimei/term/pas-1192-3","type":"term","register":"canonical","status":"canonical","grounding":"pending","liveVersion":1,"pinned":false,"version":null,"provenance":{"sourceApp":"legacy-bimd","sourceId":"pas-1192-3","changeSource":"override","curator":"legacy-migration"},"language":"en","jurisdiction":null,"label":{"lang":"en","jurisdiction":"GB","requestedJurisdiction":null,"fellBack":true,"prefLabel":"PAS 1192-3","definition":"Specification for Information Management for the Operational Phase of Assets using Building Information Modelling (BIM) (PAS 1192-3:2014)","altLabels":[]},"labels":{"cs":{"GB":{"prefLabel":"PAS 1192-3","definition":"Specifikace pro management informací pro provozní fázi aktiv s využitím informačního modelování staveb (BIM) (PAS 1192-3:2014)","altLabels":[]}},"es":{"GB":{"prefLabel":"PAS 1192-3","definition":"Especificación para la Gestión de la Información para la Fase de Operación de Activos usando el Modelado de Información de la Construcción (PAS 1192-3:2014)","altLabels":[]}},"ca":{"GB":{"prefLabel":"PAS 1192-3","definition":"Especificació per a la Gestió de la Informació per a la Fase d'Operació d'Actius utilitzant el Modelatge d'Informació de la Construcció (PAS 1192-3:2014)","altLabels":[]}},"el":{"GB":{"prefLabel":"PAS 1192-3","definition":"Προδιαγραφή για τη Διαχείριση Πληροφοριών για τη Φάση Λειτουργίας των Περιουσιακών Στοιχείων χρησιμοποιώντας Πληροφορική Μοντελοποίηση Κατασκευων (BIM) (PAS 1192-3:2014)","altLabels":[]}},"ar":{"GB":{"prefLabel":"PAS 1192-3","definition":"مواصفات إدارة المعلومات لطور تشغيل الأصول باستخدام نمذجة معلومات البناء (PAS  1192-3: 2014)","altLabels":[]}},"fr":{"GB":{"prefLabel":"PAS 1192-3","definition":"PAS 1192-3 provides guidance to Asset Managers on how to integrate the management of information across the longer term activity of asset management with the shorter term activity of asset construction for a portfolio of assets.\nPAS 1192-3 is a partner to PAS 1192-2. PAS 1192-2 specifies an information management process to support [[Level 2 BIM]] in the capital/delivery phase of projects. In contrast, PAS 1192-3 focuses on the operational phase of assets irrespective of whether these were commissioned through direct capital works, acquired through transfer of ownership or already existed in an asset portfolio. However, like [[PAS 1192-2]], PAS 1192-3 applies to both building and infrastructure assets and is based on the existing code of practice for the collaborative production of architectural, engineering and construction information that is defined within [[BS 1192]]:2007 + A2:2016. It is envisaged that cost savings of 33% can be achieved across the CAPEX and OPEX phases through implementation of the processes outlined in PAS 1192-2 and PAS 1192-3.\nPAS 1192-3 has been developed in recognition of the fact that the cost of operating and maintaining buildings and facilities can represent up to 85% of the whole-life cost, and savings can pay back any upfront premium in construction expenses in a few years. [Source: http://bim-level2.org/]","altLabels":[]}},"fa":{"GB":{"prefLabel":"PAS 1192-3","definition":"مشخصات برای مدیریت اطلاعات برای فاز بهره برداری با استفاده از مدل سازی اطلاعات ساختمان (BIM) (PAS 1192-3:2014)","altLabels":[]}},"en":{"GB":{"prefLabel":"PAS 1192-3","definition":"Specification for Information Management for the Operational Phase of Assets using Building Information Modelling (BIM) (PAS 1192-3:2014)","altLabels":[]}}}}