{"iri":"https://w3id.org/bimei/term/work-breakdown-structure","type":"term","register":"canonical","status":"canonical","grounding":"pending","liveVersion":2,"pinned":false,"version":null,"provenance":{"sourceApp":"legacy-bimd","sourceId":"work-breakdown-structure","changeSource":"override","curator":"Bilal Succar","curatorRole":"Head Editor"},"language":"en","jurisdiction":null,"label":{"lang":"en","jurisdiction":null,"requestedJurisdiction":null,"fellBack":false,"prefLabel":"Work Breakdown Structure","description":"A tree-structure breakdown of a project into its smaller components intended to organise and define the total scope of a project. WBS (within the construction industry) specifies the activities and tasks necessary to design and/or build a project. WBS is used in both [[Activity Based Scheduling]] and [[Location Based Scheduling]]","altLabels":["WBS"]},"labels":{"cs":{"*":{"prefLabel":"Hierarchická struktura prací","description":"Rozklad projektu skrze stromovou hierarchii na jeho menší objekty, dle které lze organizovat a definovat celkový rozsahu projektu. WBS (v rámci stavebního průmyslu) určuje potřebné činnosti a úlohy pro návrh a/nebo realizaci projektu. WBS se používá jak pro [[Časové plánování podle činností]] tak i pro [[Lineární plánování]]","altLabels":["Hierarchické struktury prací","Hierarchické struktuře prací","Hierarchických struktur prací"]}},"en":{"*":{"prefLabel":"Work Breakdown Structure","description":"A tree-structure breakdown of a project into its smaller components intended to organise and define the total scope of a project. WBS (within the construction industry) specifies the activities and tasks necessary to design and/or build a project. WBS is used in both [[Activity Based Scheduling]] and [[Location Based Scheduling]]","altLabels":["WBS"]}},"ar":{"*":{"prefLabel":"هيكل تقسيم العمل","description":"هيكل التجزئة الشجري للمشروع  إلى مكونات أصغر تهدف لتنظيم وتحديد النطاق الكلي للمشروع. هيكل تجزئة العمل (ضمن صناعة البناء والتشييد) تحدد الأنشطة والمهام اللازمة لتصميم و/أو بناء المشروع. يستخدم هيكل تجزئة العمل في كل من [[الجدولة القائمة على النشاط]] و [[الجدولة المكانية]]","altLabels":[]}},"ca":{"*":{"prefLabel":"Estructura de desglossament del treball","description":"Estructura en forma d'arbre dels components més petits en els que es desglossa un projecte, amb la finalitat d'organitzar i definir l'abast total del mateix. WBS (en el sector de la construcció) especifica les activitats i tasques necessàries per a dissenyar i/o construir un projecte. WBS s'utilitza tant en la [[Programació basada en activitats]] com en la [[Programació basada en àrees]]","altLabels":[]}},"de":{"*":{"prefLabel":"Work Breakdown Structure","description":"Eine Baumstrukturgliederung eines Projekts in seine kleineren Komponenten, um den Gesamtumfang eines Projekts zu organisieren und zu definieren. Der Projektstrukturplan (innerhalb der Bauindustrie) legt die Tätigkeiten und Aufgaben fest, die für die Planung und/oder den Bau eines Projekts erforderlich sind. Der Projektstrukturplan wird sowohl in der [[Activity Based Scheduling]] als auch in der [[Location Based Scheduling]] verwendet.","altLabels":[]}},"es":{"*":{"prefLabel":"Estructura de desglose de trabajo","description":"Estructura en forma de árbol de los componentes más pequeños en que se desglosa un proyecto, con el fin de organizar y definir el alcance total del mismo. EDT (en el sector de la construcción) especifica las actividades y tareas necesarias para diseñar y/o construir un proyecto. EDT se utiliza tanto en [[Planificación basada en actividades]] como en [[Programación basada en zonas]]","altLabels":[]}},"fr":{"*":{"prefLabel":"Structure de découpage du projet","description":"Structure arborescente d'un projet en ses composantes plus petites, destinée à organiser et à définir la portée totale d'un projet. Le WBS (dans l'industrie de la construction) précise les activités et les tâches nécessaires à la conception ou à la construction d'un projet. Le WBS est utilisé à la fois dans l'[[Ordonnancement par activités]] et l'[[Ordonnancement par localisation]].","altLabels":[]}},"hr":{"*":{"prefLabel":"hijerarhijska raščlamba rada","description":"Raščlamba projekta u manje komponente u obliku stablaste strukture u cilju organizacije i definiranja ukupnog opsega projekta. Hijerarhijska raščlamba rada (WBS) (unutar građevinske industrije) specificira aktivnosti i zadatke potrebne za projektiranje i/ili izvođenje projekta. WBS se koristi i u vremenskome planiranju temeljenome na aktivnostima ([[vremensko planiranje temeljeno na aktivnostima]]) i planiranju temeljenome na lokaciji ([[planiranje temeljeno na lokaciji]]).","altLabels":[]}},"zh":{"*":{"prefLabel":"任务分解法","description":"将项目的树结构分解为更小的组件，用于组织和定义项目的总体范围。WBS(在建筑行业内)指定设计和/或构建项目所需的活动和任务。[[基于活动的调度]]和[[基于位置的调度]]都使用了WBS。","altLabels":[]}}}}