{"type":"term","total":116,"page":1,"items":[{"iri":"https://w3id.org/bimei/term/barrier","slug":"barrier","label":"Barrier","description":"A factor that prevents or slows the adoption or effective use of a practice, tool or method by an individual, organisation or market. Barriers may be technical, such as incompatible software or poor data exchange; organisational, such as cost, lack of skills or resistance to change; or market-wide, such as missing standards, unclear contracts or low client demand. Identifying barriers helps decide which support, training or policy actions will move [[BIM Adoption]] forward. Unlike a [[Negative Disruption]], which is an event that pushes performance below its baseline, a barrier is a standing condition that holds adoption back","altLabels":[],"status":"canonical","register":"canonical","grounding":"pending"},{"iri":"https://w3id.org/bimei/term/baseline-security-measure","slug":"baseline-security-measure","label":"Baseline Security Measure","description":"Contractually required measures relating to personal and commercial information (refer to [[PAS 1192-5]])","altLabels":[],"status":"canonical","register":"canonical","grounding":"pending"},{"iri":"https://w3id.org/bimei/term/basic-competency","slug":"basic-competency","label":"Basic Competency","description":"The minimum level of [[Competency]] to satisfy the requirements of a role or position","altLabels":["Minimum Competency"],"status":"canonical","register":"canonical","grounding":"pending"},{"iri":"https://w3id.org/bimei/term/benefit","slug":"benefit","label":"Benefit","description":"A gain, measurable or perceived, that an individual, organisation or market obtains or expects from an investment, change or activity, such as lower cost, shorter time, reduced risk, better quality or improved career prospects. A measurable benefit can be tracked through a [[Key Performance Indicator]], for example fewer design errors reaching site; a perceived one, such as greater confidence in project information, is usually gathered through surveys or interviews. Benefits expected at the start of a change are later compared with those actually gained, through benefits realisation. [[Value Management]] weighs expected benefits against their cost to establish value","altLabels":[],"status":"canonical","register":"canonical","grounding":"pending"},{"iri":"https://w3id.org/bimei/term/benefits-realisation","slug":"benefits-realisation","label":"Benefits Realisation","description":"The process of identifying the benefits an investment or change is expected to deliver, tracking them as it is implemented, and confirming which were actually gained compared with what was expected at the outset. It gives each benefit an owner and a measure, sets a baseline before the change, and reviews results at agreed points, often well after the project that delivered the change has closed. For digital transformation, it shows whether the expected savings, quality gains or reduced risks of adopting new tools and workflows have materialised. Benefits realisation is a process; a [[Measure of Outcome]] is one of the measures it can use to confirm that outcomes were achieved","altLabels":["Benefits Realization"],"status":"canonical","register":"canonical","grounding":"pending"},{"iri":"https://w3id.org/bimei/term/best-practice","slug":"best-practice","label":"Best Practice","description":"Operational methods arising from experience; promoted as advantageous; and replicable by other individuals, organizations and teams. This term or [[Knowledge Content Type]] applies to publications which list unambiguous and detailed recommendations, and which if applied as recommended, generate similar advantageous outcomes","altLabels":[],"status":"canonical","register":"canonical","grounding":"pending"},{"iri":"https://w3id.org/bimei/term/big-bim","slug":"big-bim","label":"BIG BIM","description":"Big picture business process changes and the steps needed to integrate data from everywhere to understand what you are doing in a big world context. Business requirements, building industry data, geographical information and real-time operations intersect to support integrated decision-making using interfaces tailored to individual users and needs. Data and information are king. With BIG BIM, data is fed from distributed, shareable and interoperable repositories, interconnected to encompass everything about assets. You create or manipulate data using an almost unlimited set of tools in a sustainable process that is no longer in isolation from anything or anyone (also refer to [[little bim]])","altLabels":[],"status":"canonical","register":"canonical","grounding":"pending"},{"iri":"https://w3id.org/bimei/term/bill-of-quantities","slug":"bill-of-quantities","label":"Bill of Quantities","description":"An itemised list of construction materials and prefabricated parts. A Bill of Quantities (BOQ) is typically part of a more comprehensive [[Cost Estimate]] for use in procurement and tendering","altLabels":["BOQ"],"status":"canonical","register":"canonical","grounding":"pending"},{"iri":"https://w3id.org/bimei/term/bim-addendum","slug":"bim-addendum","label":"BIM Addendum","description":"A guide or a contractually-binding document used to identify the responsibilities of [[Project Participant]]s undertaking a [[Collaborative BIM Project]]. A BIM Addendum focuses on legal/regulatory aspects including those related to risk mitigation, ownership of intellectual property, etc.","altLabels":[],"status":"canonical","register":"canonical","grounding":"pending"},{"iri":"https://w3id.org/bimei/term/bim-adoption","slug":"bim-adoption","label":"BIM Adoption","description":"BIM Adoption refers to either [[BIM Implementation]], [[BIM Diffusion]], or a mixture of the two terms. Please refer to [[Point of Adoption]]","altLabels":[],"status":"canonical","register":"canonical","grounding":"pending"},{"iri":"https://w3id.org/bimei/term/bim-capability","slug":"bim-capability","label":"BIM Capability","description":"BIM Capability represents the minimum abilities of an organization or team to deliver measurable BIM outcomes. BIM Capability is the second phase of [[BIM Implementation]] and covers many technology, process and policy topics. BIM Capability is achieved/measured through well-defined revolutionary [[BIM Stage]]s separated by numerous evolutionary [[BIM Step]]s","altLabels":[],"status":"canonical","register":"canonical","grounding":"pending"},{"iri":"https://w3id.org/bimei/term/bim-capability-set","slug":"bim-capability-set","label":"BIM Capability Set","description":"The BIM Capability Set is a taxonomy representing [[BIM Player]]’s abilities to satisfy a [[BIM Requirement]] or generate a [[BIM Deliverable]]","altLabels":[],"status":"canonical","register":"canonical","grounding":"pending"},{"iri":"https://w3id.org/bimei/term/bim-champion","slug":"bim-champion","label":"BIM Champion","description":"A self-motivated person who undertakes the task of facilitating and implementing BIM concepts and workflows within an organization, [[Project Team]] or industry. Someone is perceived to be a BIM Champion when his/her actions are at the leading edge of BIM technology, process or policy","altLabels":[],"status":"canonical","register":"canonical","grounding":"pending"},{"iri":"https://w3id.org/bimei/term/bim-collaboration-event","slug":"bim-collaboration-event","label":"BIM Collaboration Event","description":"A meeting, presentation or workshop conducted as part of a [[Collaborative BIM Project]]. An event may be conducted in meeting room, [[Immersive Environment]] or online and includes at least two [[Project Participant]]s","altLabels":[],"status":"canonical","register":"canonical","grounding":"pending"},{"iri":"https://w3id.org/bimei/term/bim-collaboration-format","slug":"bim-collaboration-format","label":"BIM Collaboration Format","description":"A schema used for exchanging information and model viewpoints between individuals irrespective of the software tools used. Implemented as both an XML file (bcfXML) format and a RESTful API webservice (bcfAPI), the Open BIM Collaboration Format (BCF) is typically used to highlight issues discovered during model reviews. The schema allows for the exchange of comments and images linked to specific [[Model Component]]s through their unique [[Global Unique IDentifier]]s (GUID)","altLabels":["BCF"],"status":"canonical","register":"canonical","grounding":"pending"},{"iri":"https://w3id.org/bimei/term/bim-collaboration-guide","slug":"bim-collaboration-guide","label":"BIM Collaboration Guide","description":"A guide used at the start of a collaboration process to facilitate data exchange, identify modelling responsibilities and clarify project workflows","altLabels":["BIM Project Execution Plan (PennState)","BIM Delivery Manual","BIM Protocol (UK)","BIM Management Plan (NATSPEC)"],"status":"canonical","register":"canonical","grounding":"pending"},{"iri":"https://w3id.org/bimei/term/bim-compatibility","slug":"bim-compatibility","label":"BIM Compatibility","description":"BIM Compatibility is the 'collaboration potential' of project partners measured by analysing their communication networks, standards, collaborative culture and data integration bottlenecks","altLabels":[],"status":"canonical","register":"canonical","grounding":"pending"},{"iri":"https://w3id.org/bimei/term/bim-competency","slug":"bim-competency","label":"BIM Competency","description":"BIM Competency is a specialized type of [[Competency]] representing the ability of an individual or team to generate pre-defined [[BIM Deliverable]]s","altLabels":["BIM Competencies"],"status":"canonical","register":"canonical","grounding":"pending"},{"iri":"https://w3id.org/bimei/term/bim-consultant","slug":"bim-consultant","label":"BIM Consultant","description":"A [[BIM Service Provider]] who provides advice, modelling, auditing, training, and other types of services to clients (not employers). BIM Consultants are many types including those who provide assistance to resolve technical, operational, managerial and/or strategic challenges","altLabels":["BIM Advisor"],"status":"canonical","register":"canonical","grounding":"pending"},{"iri":"https://w3id.org/bimei/term/bim-coordinator","slug":"bim-coordinator","label":"BIM Coordinator","description":"A BIM Coordinator is [[BIM Role]] combining [[Model Management]], [[Project Information Management]] and process management activities. Model Management activities are technical in nature and focus on the generation and delivery of one or more [[Model Use]]s. Project information management activities focus on the inclusion/accuracy/detail of information as to meet contractual requirements. Process management activities focus on facilitating the relationship between [[Project Participant]]s by assisting them to select collaboration workflows, delivery standards and communication protocols as best suited for each particular project, or project phase. The definition of a BIM Coordinator varies between companies/markets and is sometimes used interchangeably with [[BIM Manager]] or [[Project BIM Manager]]","altLabels":[],"status":"canonical","register":"canonical","grounding":"pending"},{"iri":"https://w3id.org/bimei/term/bim-deliverable","slug":"bim-deliverable","label":"BIM Deliverable","description":"A general term referring to [[BIModel]]s, [[Model Component]]s, [[Model-based Deliverable]]s and all other project/process deliverables expected out of using [[BIM Software Tool]]s and [[BIM Workflow]]s","altLabels":[],"status":"canonical","register":"canonical","grounding":"pending"},{"iri":"https://w3id.org/bimei/term/bim-diffusion","slug":"bim-diffusion","label":"BIM Diffusion","description":"The spread of BIM tools, workflows and protocols within a population of adopters, whether within an organization or across a whole market","altLabels":[],"status":"canonical","register":"canonical","grounding":"pending"},{"iri":"https://w3id.org/bimei/term/bim-education","slug":"bim-education","label":"BIM Education","description":"The formal or informal efforts to teach/learn about [[BIM Software Too]]s, [[Model Use]]s and [[Model-based Workflow]]s. Formal BIM Education relies on structured delivery and the provision of an award (degree, certificate or similar). Informal BIM Education refers to learning based on reading, attending seminars or similar (no certificate is awarded). Some educational programs (e.g. [[CPD]] programs) can include both formal and informal BIM Education ","altLabels":[],"status":"canonical","register":"canonical","grounding":"pending"},{"iri":"https://w3id.org/bimei/term/bim-erp-linking","slug":"bim-erp-linking","label":"BIM/ERP Linking","description":"A [[Model Use]] representing the integration of data residing within [[BIModel]]s (e.g. component and space metadata) with data managed by multiple [[Enterprise Resource Planning]] (ERP) modules (e.g. finance, HR, and inventory modules)","altLabels":[],"status":"canonical","register":"canonical","grounding":"pending"},{"iri":"https://w3id.org/bimei/term/bim-execution-plan","slug":"bim-execution-plan","label":"BIM Execution Plan","description":"A plan explaining how a [[Delivery Team]] will carry out the information management side of an [[Appointment]]. Under [[ISO 19650-2]] it is written twice. The prospective [[Lead Appointed Party]] submits a pre-appointment BIM execution plan with its tender (5.3.2), describing how the team will meet the appointing party's [[Exchange Information Requirements]] and showing its capability and capacity to manage information. It names the individuals who will undertake the information management function, outlines the team's task teams and commercial relationships, and proposes a [[Federation Strategy]], a [[High Level Responsibility Matrix]], the software, hardware and IT infrastructure to be used, and any changes the team needs to the project's [[Information Standard]] or information production methods and procedures. Once appointed, the lead appointed party confirms the plan with each appointed party (5.4.1), updating the strategy and matrix as needed. It then joins the appointment documents with the [[Master Information Delivery Plan]], which schedules what each task team delivers and when, and both are changed only through change control (5.4.6)","altLabels":["BEP"],"status":"canonical","register":"canonical","grounding":"pending"},{"iri":"https://w3id.org/bimei/term/bim-facilitation","slug":"bim-facilitation","label":"BIM Facilitation","description":"The process of coordinating [[Model-based Collaboration]] efforts between [[Project Participant]]s within and outside [[BIM Collaboration Event]]s. BIM Facilitation is typically conducted by the [[Primary Consultant]], the Project Manager or a specialized [[BIM Service Provider]","altLabels":[],"status":"canonical","register":"canonical","grounding":"pending"},{"iri":"https://w3id.org/bimei/term/bim-facilitator","slug":"bim-facilitator","label":"BIM Facilitator","description":"An individual or an organization acting (formally or informally) as a process facilitator during a [[Collaborative BIM Project]]. A BIM Facilitator may use predefined [[Collaborative BIM Workflow]]s, a [[BIM Management Plan]] or similar to increase the efficiency of project exchanges ","altLabels":[],"status":"canonical","register":"canonical","grounding":"pending"},{"iri":"https://w3id.org/bimei/term/bim-field","slug":"bim-field","label":"BIM Field","description":"BIM Fields  is the first of three dimensions of the [[BIM Framework]] and refer to the scope of topics and activities across the whole BIM domain. There are three types of fields: [[Technology Field]], [[Process Field]] and [[Policy Field]]. Each Field type has three components: [[BIM Player]]s, [[BIM Deliverable]]s and [[BIM Requirement]]s","altLabels":[],"status":"canonical","register":"canonical","grounding":"pending"},{"iri":"https://w3id.org/bimei/term/bim-filter","slug":"bim-filter","label":"BIM Filter","description":"The conceptual opposite of a [[BIM Lens]], one of the three dimensions of the [[BIM Framework]]. While Lenses highlight observables that meet research criteria and identify their relations, Filters remove observables that do not meet the research criteria. A [[Granularity Level]] is an example of a BIM Filter","altLabels":[],"status":"canonical","register":"canonical","grounding":"pending"},{"iri":"https://w3id.org/bimei/term/bim-fm-integration","slug":"bim-fm-integration","label":"BIM/FM Integration","description":"A [[Model Use]] representing the integration of BIM technologies and processes with [[Facility Management]] deliverables, databases and workflows","altLabels":["BIMFMI"],"status":"canonical","register":"canonical","grounding":"pending"},{"iri":"https://w3id.org/bimei/term/bim-framework","slug":"bim-framework","label":"BIM Framework","description":"The BIM Framework clarifies the concepts and relations underlying the BIM domain. It is represented by three axes which interact to generate all other concepts and tools. The three dimensions are [[BIM Field]]s, [[BIM Stage]]s and [[BIM Lens]]es","altLabels":[],"status":"canonical","register":"canonical","grounding":"pending"},{"iri":"https://w3id.org/bimei/term/bim-gis-overlapping","slug":"bim-gis-overlapping","label":"BIM/GIS Overlapping","description":"A [[Model Use]] representing how [[BIModel]]s are used to populate and/or integrate with [[Geographic Information System]]s","altLabels":[],"status":"canonical","register":"canonical","grounding":"pending"},{"iri":"https://w3id.org/bimei/term/bim-goal","slug":"bim-goal","label":"BIM Goal","description":"BIM Goals form part of a [[BIM Strategy]]. As opposed to [[BIM Objective]]s, BIM Goals are qualitative in nature. Examples of BIM Goals include seeking to become a BIM leader or seeking to increase staff motivation","altLabels":[],"status":"canonical","register":"canonical","grounding":"pending"},{"iri":"https://w3id.org/bimei/term/bim-guide","slug":"bim-guide","label":"BIM Guide","description":"Compilation of several [[Knowledge Content Type]]s with the aim of providing guidance to individuals, teams or organizations. Guides typically provide insight into a complex BIM topic (e.g. [[BIM Implementation]] guide or [[Facility Handover Guide]]). BIM Guides typically focus on knowledge-intensive topics, while [[BIM Manual]]s focus on skill-intensive ones","altLabels":[],"status":"canonical","register":"canonical","grounding":"pending"},{"iri":"https://w3id.org/bimei/term/bim-hardware","slug":"bim-hardware","label":"BIM Hardware","description":"BIM Hardware refers to computers, equipment and peripherals which are specifically needed to generate [[BIModel]]s and enable particular [[Model Use]]s. The term BIM Hardware thus refers to tablets used in [[Field BIM]] and [[3D Laser Scanner]]s used - as part of a workflow - to generate as-built object-based models","altLabels":[],"status":"canonical","register":"canonical","grounding":"pending"},{"iri":"https://w3id.org/bimei/term/bim-implementation","slug":"bim-implementation","label":"BIM Implementation","description":"BIM implementation refers to the set of activities undertaken by an organizational unit to prepare for, deploy or improve its BIM deliverables (products) and their related workflows (processes). BIM implementation is made of three phases: [[BIM Readiness]], [[BIM Capability]], and [[BIM Maturity]]","altLabels":[],"status":"canonical","register":"canonical","grounding":"pending"},{"iri":"https://w3id.org/bimei/term/bim-implementation-plan","slug":"bim-implementation-plan","label":"BIM Implementation Plan","description":"A document detailing what [[BIM Implementation]] steps to be completed and by when. For example, a BIM Implementation Plan may identify milestones for purchasing [[BIM Software Tool]]s , developing [[Modelling Standard]]s or training staff","altLabels":["BIM Implementation Programme"],"status":"canonical","register":"canonical","grounding":"pending"},{"iri":"https://w3id.org/bimei/term/bim-implementation-strategy","slug":"bim-implementation-strategy","label":"BIM Implementation Strategy","description":"A documented high-level plan to deploy [[BIM Software Tool]]s, processes and protocols within an organization. A BIM Implementation Strategy typically includes several components with a [[BIM Training Plan]] at its core","altLabels":[],"status":"canonical","register":"canonical","grounding":"pending"},{"iri":"https://w3id.org/bimei/term/bim-iot-interfacing","slug":"bim-iot-interfacing","label":"BIM/IOT Interfacing","description":"A [[Model Use]] representing how [[BIModel]]s are used as an interface for the [[Internet of Things]], a network of equipment, sensors, wearables, and benefit from the data feeds for [[Building Automation]], [[Real-time Utilization]] and [[Asset Tracking]]","altLabels":[],"status":"canonical","register":"canonical","grounding":"pending"},{"iri":"https://w3id.org/bimei/term/bim-knowledge","slug":"bim-knowledge","label":"BIM Knowledge","description":"BIM Knowledge is a term that describes the non-software aspects of BIM. It refers to domain-specific education, project experience and what should be known by individuals in order to generate accurate and useful [[BIModel]]s. As opposed to [[BIM Skill]] which focuses on how good a software operator is, BIM Knowledge focuses on knowledge specific to each [[BIM Use]], process management, team management, facilitation, collaboration and other critical aspects of BIM workflows. BIM Knowledge is what can be typically learned through education and long-term exposure","altLabels":[],"status":"canonical","register":"canonical","grounding":"pending"},{"iri":"https://w3id.org/bimei/term/bim-lens","slug":"bim-lens","label":"BIM Lens","description":"BIM Lenses are distinctive layers of analysis applied to [[BIM Field]]s and [[BIM Stage]]s to generate knowledge views which ‘abstract’ the BIM domain and control its complexity by removing unnecessary detail. BIM Lenses are one of the three dimensions of the [[BIM Framework]] and includes three types Lenses: Disciplinary Lenses (e.g. [[Data Management]]), Scoping Lenses (e.g. [[Organizational Scale]] and Conceptual Lenses (e.g. the concept of 'role' within the [[BIM Ontology]])","altLabels":[],"status":"canonical","register":"canonical","grounding":"pending"},{"iri":"https://w3id.org/bimei/term/bim-level","slug":"bim-level","label":"BIM Level","description":"An articulation of expected capability levels, their supporting standards and guidance, and how they apply to projects and contracts. Refer to [[Level 0 BIM]], [[Level 1 BIM]], [[Level 2 BIM]] and [[Level 3 BIM]]. BIM Levels are specific to the historic UK framework and should not be confused with research-based [[BIM Stage]]s or [[BIM Maturity Level]]s","altLabels":[],"status":"canonical","register":"canonical","grounding":"pending"},{"iri":"https://w3id.org/bimei/term/bim-management-plan","slug":"bim-management-plan","label":"BIM Management Plan","description":"A formal document defining how a [[Collaborative BIM Project]] will be delivered, used in Australian practice before the adoption of AS ISO 19650. A BIM Management Plan (BMP) could include model-exchange requirements and detailed guidance covering [[BIM Role]]s, [[Modelling Standard]]s and [[Data Exchange Protocol]]s, and could form part of the [[Contractual Relationship]] between [[Project Participant]]s. The first edition of the [[NATSPEC National BIM Guide]] distinguished design and construction BMPs; its 2022 edition renamed the document a [[BIM Execution Plan]], in line with AS ISO 19650","altLabels":[],"status":"canonical","register":"canonical","grounding":"pending"},{"iri":"https://w3id.org/bimei/term/bim-manager","slug":"bim-manager","label":"BIM Manager","description":"A person responsible for leading the [[BIM Implementation]] process within an organization and supporting it in developing/delivering new BIM services and model-based efficiencies. Also Refer to [[Project BIM Manager]]","altLabels":[],"status":"canonical","register":"canonical","grounding":"pending"},{"iri":"https://w3id.org/bimei/term/bim-mandate","slug":"bim-mandate","label":"BIM Mandate","description":"A set of [[Information Exchange]] and delivery requirements stipulated by a recognised authority (e.g. a government or a ministry) across a country or a state/region. These [[Information Requirement]]s include the enforceable use of [[Building Information Modelling]] tools and workflows on projects of specified size/value or the delivery of specified [[Digital Asset]]s at one or more [[Asset Life Cycle]] phase. A BIM Mandate is typically based on published [[BIM Guide]]s, [[BIM Protocol]]s, or local/international standards. A BIM Mandate is in effect from the date it is enforced rather than the date it was announced. Enforcement may be through a procurement directive, applicable codes, or a dedicated law.","altLabels":[],"status":"canonical","register":"canonical","grounding":"pending"},{"iri":"https://w3id.org/bimei/term/bim-manual","slug":"bim-manual","label":"BIM Manual","description":"A structured document which is intended to clarify the steps needed to perform a measurable activity or deliver a measurable outcome (e.g. BIM [[Training Manual]]). BIM Manuals typically focus on skill-intensive topics, while [[BIM Guide]]s typically focus on knowledge-intensive ones","altLabels":[],"status":"canonical","register":"canonical","grounding":"pending"},{"iri":"https://w3id.org/bimei/term/bim-marketing-plan","slug":"bim-marketing-plan","label":"BIM Marketing Plan","description":"An ad-hoc approach or a specialized document intended to inform clients (and potential clients) about an organization's [[BIM Capability]] and [[BIM Deliverable]]s. A BIM Marketing Plan typically includes objectives to reach, media to use, and content to be developed (e.g. a BIM [[Capability Statement]]) as required to implement a BIM-focused Marketing Strategy","altLabels":[],"status":"canonical","register":"canonical","grounding":"pending"},{"iri":"https://w3id.org/bimei/term/bim-maturity","slug":"bim-maturity","label":"BIM Maturity","description":"BIM Maturity is the gradual and continual improvement in [[Quality]], repeatability and predictability within available [[BIM Capability]]. BIM Maturity is the third phase of [[BIM Implementation]] and is expressed as [[BIM Maturity Level]]s (or performance improvement milestones) that organizations, teams and whole markets aspire to","altLabels":[],"status":"canonical","register":"canonical","grounding":"pending"},{"iri":"https://w3id.org/bimei/term/bim-maturity-index","slug":"bim-maturity-index","label":"BIM Maturity Index","description":"A metric to measure [[BIM Maturity]] of organizations, [[Project Team]]s and whole markets. BIMMI has five distinct [[BIM Maturity Level]]s: (a) [[BIM Maturity Level a]] (Initial/Low/Ad-hoc), (b) [[BIM Maturity Level b]] (Defined/Medium-Low), (c) [[BIM Maturity Level c]] (Managed/Medium), (d) [[BIM Maturity Level d]] (Integrated/Medium-High) and (e) [[BIM Maturity Level e]] (Optimized/High)","altLabels":["BIMMI"],"status":"canonical","register":"canonical","grounding":"pending"},{"iri":"https://w3id.org/bimei/term/bim-maturity-level","slug":"bim-maturity-level","label":"BIM Maturity Level","description":"A set of well-defined milestones representing the extent of [[BIM Maturity]] within an organization, [[Project Team]] or even the whole market. In general, the progression from lower to higher levels of BIM Maturity indicates (i) better control through minimizing variations between targets and actual results, (ii) better predictability and forecasting by lowering variability in competency, performance and costs and (iii) greater effectiveness in reaching defined goals and setting new more ambitious ones...Note: BIM Maturity Levels are not to be confused with the former UK [[BIM Level]]s","altLabels":[],"status":"canonical","register":"canonical","grounding":"pending"}]}