{"type":"term","total":89,"page":1,"items":[{"iri":"https://w3id.org/bimei/term/parametric-model","slug":"parametric-model","label":"Parametric Model","description":"A term referring to 3D models where objects/elements can be manipulated (by the end-user) using explicit parameters, rules or constraints. As opposed to [[Generative Model]]s, [[BIModel]]s and their [[Model Component]]s are parametric and follow rules of 'inheritance' (Types and Instances) and 'encapsulation' (objects within objects - e.g. Curtain Wall with panels, mullions). Parametric Models also store lots of information within the data-objects similar to cost, model, fire rating, etc.","altLabels":[],"status":"canonical","register":"canonical","grounding":"pending"},{"iri":"https://w3id.org/bimei/term/partnership-and-alliancing","slug":"partnership-and-alliancing","label":"Partnership and Alliancing","description":"BIMe Topic under [[Managerial Competency]]: Initiating partnerships and alliances with other organizations based on [[BIM Deliverable]]s and workflows","altLabels":[],"status":"canonical","register":"canonical","grounding":"pending"},{"iri":"https://w3id.org/bimei/term/pas-1192-2","slug":"pas-1192-2","label":"PAS 1192-2","description":"Specification for Information Management for the Capital/Delivery Phase of Construction Projects using Building Information Modelling (PAS 1192-2:2013). A historic UK specification, withdrawn in 2019 and replaced by [[ISO 19650-1]] and [[ISO 19650-2]], adopted in the UK as BS EN ISO 19650-1 and -2","altLabels":[],"status":"canonical","register":"canonical","grounding":"pending"},{"iri":"https://w3id.org/bimei/term/pas-1192-3","slug":"pas-1192-3","label":"PAS 1192-3","description":"Specification for Information Management for the Operational Phase of Assets using Building Information Modelling (BIM) (PAS 1192-3:2014). A historic UK specification, withdrawn in 2020 and replaced by [[ISO 19650-3]], adopted in the UK as BS EN ISO 19650-3","altLabels":[],"status":"canonical","register":"canonical","grounding":"pending"},{"iri":"https://w3id.org/bimei/term/pas-1192-5","slug":"pas-1192-5","label":"PAS 1192-5","description":"Specification for Security-minded Building Information Modelling, Digital Built Environments and Smart Asset Management (PAS 1192-5:2015). A historic UK specification, withdrawn in 2020 and replaced by [[ISO 19650-5]], adopted in the UK as BS EN ISO 19650-5","altLabels":[],"status":"canonical","register":"canonical","grounding":"pending"},{"iri":"https://w3id.org/bimei/term/pas-1192-6","slug":"pas-1192-6","label":"PAS 1192-6","description":"Specification for Collaborative Sharing and Use of Structured Health and Safety Information using BIM (PAS 1192-6:2018). A historic UK specification, withdrawn in 2025 and replaced by [[ISO 19650-6]], adopted in the UK as BS EN ISO 19650-6","altLabels":[],"status":"canonical","register":"canonical","grounding":"pending"},{"iri":"https://w3id.org/bimei/term/past-performance-information","slug":"past-performance-information","label":"Past Performance Information","description":"A structured document which logs actual project performance of an organization or [[Project Team]]. PPI can include a variety of metrics which measure how well a project has been delivered against defined criteria. In BIM Excellence, PPI is used as a [[BIMe Metric]] to reflect the extent a [[Service Provider]]s have met the requirements they've committed to in their service proposals","altLabels":["PPI"],"status":"canonical","register":"canonical","grounding":"pending"},{"iri":"https://w3id.org/bimei/term/payment-certificate","slug":"payment-certificate","label":"Payment Certificate","description":"The document in which a certifier states the [[Amount Certified]] for a payment period, often with the reasons for any line accepted in part or not at all. It answers an [[Application for Payment]] and is the basis on which the client pays. A Payment Certificate records a decision made by a named person acting for the client, usually a [[Contract Administrator]]; it is not itself evidence that the work was done","altLabels":["Certificate for Payment","Interim Payment Certificate","Progress Certificate"],"status":"canonical","register":"canonical","grounding":"pending"},{"iri":"https://w3id.org/bimei/term/performance","slug":"performance","label":"Performance","description":"The fulfilment of a claim, the delivery of a promise, the response to a request, or the achievement of an established norm or code. Also refer to [[Performance Measurement]]","altLabels":[],"status":"canonical","register":"canonical","grounding":"pending"},{"iri":"https://w3id.org/bimei/term/performance-benchmark","slug":"performance-benchmark","label":"Performance Benchmark","description":"A point of reference, a performance level, or an established standard against which [[Performance Measurement]]s can be conducted. A Performance Benchmark may be established for the [[Performance]] of individuals and groups (refer to [[Competency Benchmark]]s); organisations, project teams and whole markets (refer to [[Capability Benchmark]]s and [[Maturity Benchmark]]s); or projects and systems (refer to [[Performance Parameter]]s)","altLabels":[],"status":"canonical","register":"canonical","grounding":"pending"},{"iri":"https://w3id.org/bimei/term/performance-criteria","slug":"performance-criteria","label":"Performance Criteria","description":"The criteria to evaluate the performance of organisations, individuals and projects (using [[Performance Metric]]s) or establish the performance of Products and Systems (using [[Performance Parameter]]s). Example, a \"Preferred Relative Humidity Range of 30-40%\" is a Performance Criterion for the 'Relative Humidity' [[Performance Parameter]]","altLabels":[],"status":"canonical","register":"canonical","grounding":"pending"},{"iri":"https://w3id.org/bimei/term/performance-decline","slug":"performance-decline","label":"Performance Decline","description":"The outcome of a [[Nonadaptive Response]] to a [[Negative Disruption]]: the organisation fails to detect or address the disruption and its [[Performance]] falls below the baseline. Without mitigation, long-lasting disruptions can compound the degradation, and repeated nonadaptive responses lead to stepped and eventually terminal decline. One of four possible outcomes of a disruption.","altLabels":[],"status":"canonical","register":"canonical","grounding":"pending"},{"iri":"https://w3id.org/bimei/term/performance-elevation","slug":"performance-elevation","label":"Performance Elevation","description":"The outcome of an [[Adaptive Response]] to a [[Positive Disruption]]: the organisation benefits from the opportunity and sustains a new [[Performance]] level above its pre-disruption baseline. Repeated elevations produce stepped, continual improvement. One of four possible outcomes of a disruption, with [[Performance Stagnation]], [[Recovery]] and [[Performance Decline]].","altLabels":[],"status":"canonical","register":"canonical","grounding":"pending"},{"iri":"https://w3id.org/bimei/term/performance-improvement-lifecycle","slug":"performance-improvement-lifecycle","label":"Performance Improvement Lifecycle","description":"A [[Knowledge Workflow]] clarifying the repetitive activities to be conducted in order to continuously improve the performance of a target population (e.g. an organisation, project team or a whole market). The Performance Improvement Lifecycle includes six activities/phases: [1] Scope, [2] Assess, [3] Analyse, [4] Plan, [5] Act and [6] Measure","altLabels":["PIL"],"status":"canonical","register":"canonical","grounding":"pending"},{"iri":"https://w3id.org/bimei/term/performance-management","slug":"performance-management","label":"Performance Management","description":"BIMe Topic under [[Administration Competency]]: Assessing organizational BIM capability/maturity, [[Individual Competency]] and project performance using standardized metrics","altLabels":[],"status":"canonical","register":"canonical","grounding":"pending"},{"iri":"https://w3id.org/bimei/term/performance-measurement","slug":"performance-measurement","label":"Performance Measurement","description":"The evaluation of [[Performance]] using objective and/or subjective methods, through [[Performance Metric]]s and/or [[Performance Parameter]]s. Performance Measurement may be Absolute against established [[Performance Benchmark]]s or Relative against prior/similar evaluations","altLabels":[],"status":"canonical","register":"canonical","grounding":"pending"},{"iri":"https://w3id.org/bimei/term/performance-metric","slug":"performance-metric","label":"Performance Metric","description":"Tools and criteria for establishing levels of performance of systems, projects, individuals, teams, organizations and other organizational units (also refer to [[BIMe Metric]])","altLabels":[],"status":"canonical","register":"canonical","grounding":"pending"},{"iri":"https://w3id.org/bimei/term/performance-model","slug":"performance-model","label":"Performance Model","description":"A description of how an actor (human or machine) is supposed to operate under specific conditions. A Performance Model is used to measure or predict [[Performance]] and to identify areas for potential performance improvement","altLabels":[],"status":"canonical","register":"canonical","grounding":"pending"},{"iri":"https://w3id.org/bimei/term/performance-monitoring","slug":"performance-monitoring","label":"Performance Monitoring","description":"A [[Model Use]] representing how 3D models are used to monitor and manage [[Energy Utilisation]] and other [[Building Performance]] metrics","altLabels":[],"status":"canonical","register":"canonical","grounding":"pending"},{"iri":"https://w3id.org/bimei/term/performance-parameter","slug":"performance-parameter","label":"Performance Parameter","description":"The parameter used to establish the performance of a Product (e.g. building, vehicle or equipment) or a System (e.g. Air Ventilation or Service Delivery systems). Example of Performance Parameters include Surface Reflectance, Vibration Level and Delivery Speed). Also refer to [[Key Performance Indicator]] and [[Performance Criteria]]","altLabels":[],"status":"canonical","register":"canonical","grounding":"pending"},{"iri":"https://w3id.org/bimei/term/performance-stagnation","slug":"performance-stagnation","label":"Performance Stagnation","description":"The outcome of a [[Nonadaptive Response]] to a [[Positive Disruption]]: the organisation fails to scale the opportunity beyond an initial stage, such as a successful [[Pilot Project]], so gains stay localised, partial or temporary and overall [[Performance]] does not change. One of four possible outcomes of a disruption. Not to be confused with the [[Stagnant State]].","altLabels":[],"status":"canonical","register":"canonical","grounding":"pending"},{"iri":"https://w3id.org/bimei/term/photo-sphere","slug":"photo-sphere","label":"Photo Sphere","description":"A [[Virtual Reality]] (VR) photography technique for generating panoramic, spherical images composed of seemlessly stitched individual photos. Photo Sphere was first introduced by Google for its Android operating system but can be also experienced through dedicated [[PhotoSphere Viewer]]s","altLabels":["Photosphere"],"status":"canonical","register":"canonical","grounding":"pending"},{"iri":"https://w3id.org/bimei/term/photogrammetry","slug":"photogrammetry","label":"Photogrammetry","description":"A [[Model Use]] representing the automatic or semi-automatic process of generating 3D models through photography and image analyses","altLabels":["Photo-based Modelling"],"status":"canonical","register":"canonical","grounding":"pending"},{"iri":"https://w3id.org/bimei/term/photosphere-viewer","slug":"photosphere-viewer","label":"PhotoSphere Viewer","description":"A software application enabled by a JavaScript library for rendering [[360 Degree Photography]] and Cube Panoramas","altLabels":["Photo Sphere Viewer"],"status":"canonical","register":"canonical","grounding":"pending"},{"iri":"https://w3id.org/bimei/term/physical-asset","slug":"physical-asset","label":"Physical Asset","description":"A tangible item of transactional value. A physical [[Asset]] can be of any [[Asset Scale]], a single pump, a drainage system, or a whole water-treatment facility","altLabels":[],"status":"canonical","register":"canonical","grounding":"pending"},{"iri":"https://w3id.org/bimei/term/physical-couple","slug":"physical-couple","label":"Physical Couple","description":"The vertical [[Milestone Couple]] that pairs [[Expected Physical Deliverable]]s at [[Information Milestone]] 2 with the actual [[Physical Asset]]s at Information Milestone 7, so that delivered assets can be checked against what was expected","altLabels":[],"status":"canonical","register":"canonical","grounding":"pending"},{"iri":"https://w3id.org/bimei/term/pilot-project","slug":"pilot-project","label":"Pilot Project","description":"A small-scale, time-bound trial of a new tool, process or practice, run on one project or with one team in a controlled setting, to test its value before deciding whether to adopt it more widely. A pilot that succeeds but is never scaled up leads to [[Performance Stagnation]].","altLabels":["Pilot"],"status":"canonical","register":"canonical","grounding":"pending"},{"iri":"https://w3id.org/bimei/term/plan","slug":"plan","label":"Plan","description":"A document describing activities to perform, resources to use and milestones to reach within a defined timeframe. This [[Knowledge Content Label]] applies to publications describing – in some detail - how a specific strategy can be fulfilled or a pre-defined goal can be reached (e.g. a BIM Implementation Plan detailing how to fulfil a BIM Capability Strategy). The term 'Plan' is often confused with other [[Knowledge Content Label]]s","altLabels":[],"status":"canonical","register":"canonical","grounding":"pending"},{"iri":"https://w3id.org/bimei/term/plan-of-work","slug":"plan-of-work","label":"Plan of Work","description":"The \"document that details principal stages in the design, construction work and maintenance of a project and identifies the main tasks and people\" [[ISO 19650-2]] (3.1.2.2). A Plan of Work is a [[Project Management]] document that precedes the development of [[Project Information Requirements]] and project [[Information Delivery Milestone]]s. A Plan of Work can cover all [[Asset Life Cycle]] phases","altLabels":[],"status":"canonical","register":"canonical","grounding":"pending"},{"iri":"https://w3id.org/bimei/term/planned-value","slug":"planned-value","label":"Planned Value","description":"Planned Value (PV) is the project's baseline which consists of Authorised Work along the Authorised Budget within an Authorised Timeframe. PV is part or [[Earned Value Management]] (EVM)","altLabels":["PV"],"status":"canonical","register":"canonical","grounding":"pending"},{"iri":"https://w3id.org/bimei/term/planning","slug":"planning","label":"Planning","description":"The activity of deciding objectives, actions, resources, and arrangements before work is undertaken.","altLabels":["Strategy and planning"],"status":"canonical","register":"canonical","grounding":"pending"},{"iri":"https://w3id.org/bimei/term/planning-and-designing","slug":"planning-and-designing","label":"Planning and Designing","description":"BIMe Topic under [[Operation Competency]]: Using software tools for conceptualization, planning and design","altLabels":[],"status":"canonical","register":"canonical","grounding":"pending"},{"iri":"https://w3id.org/bimei/term/player-group","slug":"player-group","label":"Player Group","description":"Player Groups refer to clusters of industry stakeholders. There are nine Player Groups: [[Policy Maker]]s, Educational Institutions, Construction Organizations, Individual Practitioners, Technology Developers, Technology Service Providers, Industry Associations, Communities of Practice, and Technology Advocates. Player Groups include numerous [[Player Type]]s","altLabels":[],"status":"canonical","register":"canonical","grounding":"pending"},{"iri":"https://w3id.org/bimei/term/player-type","slug":"player-type","label":"Player Type","description":"Player Types refer to subdivision within [[Player Group]]s, the nine clusters representing all construction industry stakeholders. For example, the Construction Organizations group is composed of varied player types including: asset owners, architects, engineers and project managers. Also, the Individual Practitioners group is composed of professionals, associated professionals and tradespeople","altLabels":["Player Types"],"status":"canonical","register":"canonical","grounding":"pending"},{"iri":"https://w3id.org/bimei/term/point-cloud","slug":"point-cloud","label":"Point Cloud","description":"A set of data points in 3D which are typically created by [[3D Laser Scanner]]s to capture an object, space or a whole building. Point Clouds can be transformed into meshes, surfaces and even 3D objects using specialised tools. Point Cloud files can be typically imported into most [[BIM Software Tool]]s to generate [[As-Built Model]]s or model parts","altLabels":[],"status":"canonical","register":"canonical","grounding":"pending"},{"iri":"https://w3id.org/bimei/term/point-of-adoption","slug":"point-of-adoption","label":"Point of Adoption","description":"The Point of Adoption (PoA) marks the initial 'capability jump' from [[BIM Readiness]] or [[pre-BIM]] status to minimum BIM capability ([[BIM Stage 1]]). Secondary PoAs are also identifiable at the start of the other two [[BIM Stage]]s","altLabels":["PoA"],"status":"canonical","register":"canonical","grounding":"pending"},{"iri":"https://w3id.org/bimei/term/policy-action","slug":"policy-action","label":"Policy Action","description":"The actions [[Policy Maker]]s take to influence the market-wide adoption of a system or process. To advance specific [[Policy Objective]]s, a 'policymaker' can take a combination of policy actions covering key implementation activities - [A] Communicate, [B] Engage, and [C] Monitor - while reflecting each policy maker's implementation approach - [1] Passive, [2] Active, or [3] Assertive. According to the [[Policy Actions Model]], there are nine high-level policy actions: [1A] Make-aware, [2A] Educate, [3A] Prescribe, [1B] Encourage, [2B] Incentivise, [3B] Enforce, [1C] Monitor, [2C] Track, and [3C] Control","altLabels":[],"status":"canonical","register":"canonical","grounding":"pending"},{"iri":"https://w3id.org/bimei/term/policy-actions-model","slug":"policy-actions-model","label":"Policy Actions Model","description":"A [[Macro Adoption Model]] for identifying, assessing and comparing the actions [[Policy Maker]]s take (or can take) to facilitate market-wide adoption","altLabels":[],"status":"canonical","register":"canonical","grounding":"pending"},{"iri":"https://w3id.org/bimei/term/policy-document","slug":"policy-document","label":"Policy Document","description":"A published directive conveying a [[Policy Maker]]'s overall vision, mission, strategy, roadmap, or [[Policy Objective]]s","altLabels":[],"status":"canonical","register":"canonical","grounding":"pending"},{"iri":"https://w3id.org/bimei/term/policy-environment","slug":"policy-environment","label":"Policy Environment","description":"The social and political context governing how policies are influenced, devised, and enacted within a government body, corporation, or similar formal settings","altLabels":[],"status":"canonical","register":"canonical","grounding":"pending"},{"iri":"https://w3id.org/bimei/term/policy-field","slug":"policy-field","label":"Policy Field","description":"Policy Field is one of three [[BIM Field]]s and - at the macro scale - represents all topics, activities and players related to guiding practitioners, delivering protocols and generating [[Regulatory Framework]]s to organize stakeholder relationships","altLabels":[],"status":"canonical","register":"canonical","grounding":"pending"},{"iri":"https://w3id.org/bimei/term/policy-maker","slug":"policy-maker","label":"Policy Maker","description":"An individual or institution responsible (or is capable of) developing formal policies for others to adopt and follow. Policy Makers may be industry leaders, politicians, or government departments. Policy Makers is one of nine [[Player Group]] representing construction industry stakeholders","altLabels":[],"status":"canonical","register":"canonical","grounding":"pending"},{"iri":"https://w3id.org/bimei/term/policy-objective","slug":"policy-objective","label":"Policy Objective","description":"The intended outcome from developing, announcing, and implementing a defined policy through specific [[Policy Action]]s. Typically included in a high-level strategy or roadmap, policy objectives are explicit, measurable, and often distributed over defined phases, stages, or levels","altLabels":[],"status":"canonical","register":"canonical","grounding":"pending"},{"iri":"https://w3id.org/bimei/term/positive-disruption","slug":"positive-disruption","label":"Positive Disruption","description":"A [[Disruption]] that introduces new capabilities or efficiencies which, when adopted and implemented at scale, raise [[Performance]] above the established baseline: an opportunity to improve. Met with an [[Adaptive Response]], it leads to [[Performance Elevation]]; met with a [[Nonadaptive Response]], to [[Performance Stagnation]]. Also refer to [[Negative Disruption]].","altLabels":[],"status":"canonical","register":"canonical","grounding":"pending"},{"iri":"https://w3id.org/bimei/term/pre-bim","slug":"pre-bim","label":"pre-BIM","description":"The status before the introduction of BIM tools and workflows. Pre-BIM precedes [[BIM Implementation]] within organizations (and markets) and indicates the continued dependence on hand-drawing, manual calculations and 2D/3D CAD-based documentation","altLabels":[],"status":"canonical","register":"canonical","grounding":"pending"},{"iri":"https://w3id.org/bimei/term/pre-qualification-questionnaire","slug":"pre-qualification-questionnaire","label":"Pre-Qualification Questionnaire","description":"A Pre-Qualification Questionnaire (PQQ) evaluates organisations’ capabilities against set criteria. A PQQ is issued by a contracting authority or a large employer and is intended for shortlisting companies for tender/bid purposes. A PQQ typically includes a large number of questions covering financial, technical, environmental, health, safety and other requirements","altLabels":[],"status":"canonical","register":"canonical","grounding":"pending"},{"iri":"https://w3id.org/bimei/term/prefabrication","slug":"prefabrication","label":"Prefabrication","description":"Prefabrication refers to offsite manufacturing (milling, cutting or casting) of custom elements for subsequent installation onsite. Prefabrication typically refers to mass offsite production (or mass offsite customization) of units, while [[3D Printing]] refers to one-off, smaller-scale fabrication (onsite or offsite)...Also refer to [[Offsite Construction]]","altLabels":["Digital Fabrication"],"status":"canonical","register":"canonical","grounding":"pending"},{"iri":"https://w3id.org/bimei/term/presentation-and-animation","slug":"presentation-and-animation","label":"Presentation and Animation","description":"BIMe Topic under [[Technical Competency]]: Generating professional-quality renderings or 3D animations using [[Specialized Software Tool]]s","altLabels":[],"status":"canonical","register":"canonical","grounding":"pending"},{"iri":"https://w3id.org/bimei/term/preventive-maintenance","slug":"preventive-maintenance","label":"Preventive Maintenance","description":"Maintenance carried out at predetermined intervals or according to prescribed criteria to reduce the likelihood of an [[Asset]] failing or degrading. Preventive Maintenance is a subset of [[Asset Maintenance]]","altLabels":["Planned Preventive Maintenance","PPM"],"status":"canonical","register":"canonical","grounding":"pending"},{"iri":"https://w3id.org/bimei/term/primary-consultant","slug":"primary-consultant","label":"Primary Consultant","description":"The consultant responsible (by norm, contract or agreement) for coordinating the deliverables of other consultants. Unless noted, the term Primary Consultant typically refers to the Architect","altLabels":[],"status":"canonical","register":"canonical","grounding":"pending"}]}